Projects

Snowbird Mid Gad:
Layton CONSTRUCTION

 

Snowmelt system, exhaust fans, grease waste and grease duct, air handlers, VAV’s, hydronic piping, gas piping, domestic water piping and holding tank with booster pump. 

 

Fort Douglas to Camp Williams Relocation:
JACOBSEN CONSTRUCTION

 

Design assist project with air handling units, VAV’s with re-heat, hydronic piping, ductwork, domestic water, waste and vent, roof drains and gas piping.

 

USU Gardner Learning Building:
JACOBSEN CONSTRUCTION

 

4 pipe hydronic system, air handler, air separators, cabinet unit heaters, hydronic heat exchangers, steam separators, hot water radiant heaters, BTU meters, expansion tanks, exhaust fans, fan coils, pumps, snowmelt system, VAV’s with re-heat, steam traps and hot water unit heater. Plumbing scope, domestic water, waste, roof drains and gas piping. Providing “in house” BIM Modeling.

 

USU Student Housing:
JACOBSEN CONSTRUCTION

 

Design assist project and providing a 4 pipe hydronic system, fan coils, heat exchangers, pumps, expansion tanks, rooftop units with VFD’s, exhaust fans, penthouses, louvers, finned tube heaters, unit heaters and snowmelt system. Domestic water piping, sanitary piping, roof drains and gas piping.

 

USU Parking Garage:
JACOBSEN CONSTRUCTION

 

Design Build project with exhaust fans and plumbing

 

U of U TBBC GAUSS HAUS FUME HOOD EXHAUST- ACCOUSTIC IMPROVEMENTS:
UNIVERSITY OF UTAH

 

Sound attenuating inlet hoods. New fan motors. Rotate existing fan. Controls, electrical and roof upgrades.

 

VICTORY RANCH CLUBHOUSE:
NEW STAR CONSTRUCTION

 

Clubhouse project with gas fired split systems with condensing units, outside air unit, exhaust fans, electric unit heaters, wall heaters, penthouses, make up air unit, kitchen exhaust fans with grease duct, snowmelt system with boiler and pumps.

 

UNIVERSITY OF UTAH FIELDHOUSE THEATRE:
LAYTON CONSTRUCTION

 

Theatre project with relief fans, storm louvers, exhaust fans, radiant ceiling panels, VAV’s with re-heat, hot water unit heaters, pumps, heat exchangers, expansion tanks, air separators, hydronic piping and ductwork.

 

WESTERLY:
LAYTON CONSTRUCTION

 

Multi-family apartment complex with (198) rooms. Rooftop units, split systems, ductwork and refrigeration piping. Plumbing waste, vent, water and and gas piping.

 

OREM CITY HALL:
LAYTON CONSTRUCTION

 

City hall building with a VRF system, (85) indoor fan coil units, (12) outdoor units, ERV’s, in row server room cooling units, electric unit heaters, ductwork and refrigeration piping. Plumbing with waste, vent and gas piping. 

 

UTAH STATE CAPITOL PARKING GARAGE:
OKLAND CONSTRUCTION

 

Parking garage project with an ERV, fan coils, garage exhaust fans, transfer fans, unit heaters, snowmelt system, pumps and VFD’s. Plumbing waste, vent and and gas piping and sump pumps.

 

KHI OFFICE TI:
LAYTON CONSTRUCTION

 

Design build project. Packaged rooftop units, ductwork, ductless mini-split. Plumbing with roof drains, waste, vent and copper water piping

 

BACK 9:
JACOBSEN CONSTRUCTION

 

Design Build project -Multi family with 262 units, pool and amenity space with fan coils, condensing units and exhaust fans. Parking garage with large exhaust system. Plumbing waste, vent, and roof drain system.

 

MYRIAD GENETICS SLC CAMPUS WEST LAB TI:
OKLAND CONSTRUCTION

 

Over 200,000 square feet with 8 air handling units, 2 boilers, 2 chillers, 2 cooling towers, hydronic piping, ductwork, RO piping, compressed air piping, emergency showers, waste, vent and gas piping

 

REGIUS SQUARE APARTMENTS:
RVC CONSTRUCTION

 

126 unit apartments on a wood frame structure. Fan coil units with remote condensing units, ductless splits, parking garage, snowmelt system and plumbing.

 

UNIVERSITY PLACE PARKING GARAGE & OFFICE TOWER:
RALPH L.WADSWORTH CONSTRUCTION

 

VRF system, energy recovery unit, stair pressurization fans, space evacuation fans, louvered penthouses, ductless split systems, cabinet unit heaters, transfer fan, electric duct heaters, indoor heat recovery units, waste, vent, water and gas piping.

 

PROVO CITY HALL:
LAYTON CONSTRUCTION

 

Design assist project consisting of custom air handlers, air cooled chillers, electric boilers, pumps, expansion tanks, air separators, glycol make up units, chiller buffer tanks, in row server room units, fan coil units, exhaust fans, split systems, ductwork, hydronic piping, waste piping, vent piping, water and gas piping.

 

WSU NOORDA UTILITY TUNNEL & DEMOLITION:
BIG-D CONSTRUCTION

 

Demolition of existing tunnel, installed steam and condensate pipe, fusion pipe, welded domestic water pipe, gas pipe and fusion welded condenser water pipe. Including steam specialties, racks, seismic restraints and expansion joints.

 

UTAH STATE CORRECTIONAL FACILITY:
LAYTON/OKLAND a joint venture 

3 buildings (MCIRT, POD CENTER & FOOD SERVICE) mechanical and plumbing work including air handlers, rooftop units, condensing units, boilers, exhaust fans, make up air units, kitchen hoods, ductwork, heating pipe, condenser water pipe, waste pipe, vent pipe, gas pipe, compressed air pipe and roof drains.

DISCGENICS:
FRANK YOUNG CONSTRUCTION
Clean room project including high purity process piping, ductwork, air handlers, exhaust fans, boiler, chiller, gas, waste, compressed air and process waste piping.
OREM FITNESS CENTER:
BIG-D CONSTRUCTION

 

(3) Air Handling Units (2) Packaged Rooftop Units (37) VAV boxes (8) Ductless Split Systems (5) Roof Mounted Exhaust Fans (12) Destratification Fans (1) Electric Unit Heater (2) Air Cooled Chillers (2) Gas Fired Boilers, hydronic piping, ductwork, snowmelt system, waste, vent, water and gas piping.

 

EXCHANGE B:
WADMAN CONSTRUCTION

 

Multi-family housing and commercial office space project including waste, vent, gas, refrigeration and roof drain piping

 

LOGAN GATEWAY ADAMS BUILDING:
BIG D CONSTRUCTION
Two air handling units to provide heating and cooling, VAV boxes, boilers, pumps, and hydronic heating. Pluming for waste, vent, water and gas piping.
AMAZON WEST JORDAN:
LAYTON CONSTRUCTION
Complete mechanical system including rooftop package units, CRAC units, circulation fans, split systems, exhaust fans, waste piping, vent piping, domestic water piping and gas piping.
QUATTRO:
WADMAN CONSTRUCTION
Multi family housing design build project. (96) Units that include furnaces, coils, condensing units, exhaust fans, gas fired water heaters, waste, vent, and gas piping. Common areas include a make up air unit and ductless split systems.
ULTRADENT:
LAYTON CONSTRUCTION
Several projects -VAV replacements, ductwork, waste, vent and domestic water piping
MERIT MEDICAL:
JACOBSEN CONSTRUCTION
Design build project for clean room areas, boilers, pumps, hydronic piping, cooling towers and ductwork.

Includes waste, vent, water, roof drains, gas piping systems.

GRANGER MOB:
OKLAND CONSTRUCTION
VRF system (159) indoor fan coils (17) outdoor heat pumps (2) rooftop ERV’s.

Includes waste, vent, water, roof drains, gas piping systems.

NEWHOUSE BUILDING:
BIG D CONSTRUCTION
Removed and replaced duct work and piping in shafts. Replaced roof mounted energy recovery unit. Provided ductless split systems and fire smoke dampers. Provided a new cooling tower, pumps, VFD’s and heat exchangers. Installed new hydronic, waste, vent, gas and copper water piping
UNIVERSITY OF UTAH HEB BUILDING
Demo of Duct work, Exhaust fan and Fume Hoods. Installed Fume Exhaust Ventilation System, Control Dampers, Welded Stainless Steel Duct work, Controls, Unit Heater, Chilled Water Pump and Expansion Tank
BYU LAVELL EDWARDS STADIUM UPGRADE:
SPAN CONSTRUCTION
Expansion of restrooms including, exhaust fans, make up air units, waste, vent, domestic water, water closets, lavs, and floor drains
SNOWBIRD CLIFF LODGE EL CHANATE:
LAYTON CONSTRUCTION
Installed Boilers, Air Handler, VAV Boxes, Infrared Heaters, Kitchen Exhaust Fans, Hydronic Piping, Underground Duct and Plumbing
DOTERRA:
JACOBSEN CONSTRUCTION
Building F, Cafeteria Expansion Project & Call Center- installed multiple VRF systems, Exhaust and Make Up Air Units along with Pluming and Fixtures
SNOWBIRD BRIDGE:
GRANITE CONSTRUCTION COMPANY
Assembled and installed Snowmelt System for a pedestrian bridge
AMAZON FULFILLMENT CENTER:
LAYTON CONSTRUCTION
855,000 square foot building. Installed ductwork, split systems, air curtains, smoke evacuation exhaust fans, electric unit heaters, and over 70 rooftop units. Plumbing included water, waste, venting, sump pumps, and a sand & oil separator
BOILER MAKER TRAINING CENTER:
THE LINCOLN ELECTRIC COMPANY
Assembled and installed weld booth and exhaust air ductwork, filter bank, VFD, modular hoods, and a cleaning control box
TALISKER TOWER:
NEWSTAR
This project includes additional piping for the snowmelt system, new fan coils, pool room exhaust and ductwork
BINGHAM CREEK LIBRARY:
SALT LAKE COUNTY
This is a project for Salt Lake County and includes replacing the package rooftop units
UNIVERSITY OF UTAH:
We are currently working with the University of Utah on several projects including a boiler, chiller and some work at the medical center
DAYS OF ’47 ARENA AT THE UTAH STATE PARK:
Okland Construction
This project was recently completed with Okland Construction. Project included eight buildings of plumbing and HVAC
PROVO POWER:
Layton Construction
Plan and spec of HVAC equipment. HVAC consists of installation of electric radiant panels, air cooled condensing units, ductless split systems, evaporative coolers, exhaust fans, electric unit heaters, intake hood, gas fired unit heaters, indoor fan coils and a ERV system. Plumbing includes waste, vent, domestic water and roof drains
COTTONWOOD MUNICIPAL CENTER:
Layton Construction
Supply and installed exhaust fans, electric unit heaters, gas fired unit heater, VAV boxes, VRF heat pumps, VRF branch controllers, outdoor air systems, split systems, radiant tube heaters, refrigerant piping, controls, ductwork, seismic restraints, start-up, Plumbing included waste, water, and gas piping, plumbing fixtures, excavating of underground piping, testing and start-up
FAMILY SEARCH:
Span Construction
Installed a VRF system, outside air, make up air unit, roof mounted exhaust fans, inline exhaust fans, electric unit heater, cabinet unit heater, grease duct to kitchen hoods, ductwork. Plumbing included piping for waste, drain, water, gas and roof drains as well as fixtures.
HEXCEL:
Layton Construction
Installed rooftop units, exhaust fans, ductwork, temperature controls, freezer radiant slab heating, duct insulation, seismic restraints, star-up and balancing. Plumbing included waste, vent, water and gas piping. Plumbing fixtures and underground piping, testing and start-up
VARIAN MEDICAL:
Jacobsen
Supply and Installed boilers, cooling towers, custom air handlers, chillers, pumps and VDF’s including all piping and start-up. Plumbing work included waste and venting, roof drains, gas piping, water heaters and seismic restraints
BYU DATA CENTER:
Big D Construction
Supply and installed air cooled condensers, chillers, chilled water pumps, fire damper, control valves, cold water piping, heat exchangers, chilled water pumps, expansion tanks, air separators, glycol make-up tank, chemical water treatment, insulation and seismic restraints
SCHEELS:
Q&D Construction
Installed Rooftop units, cooling tower, ERV’s, Make Up Air Units and VFD’s. Included piping for waste, vent, water, gas and fixtures. Included roof drain system.
Wasatch High School:
Layton Construction
Construction of a new 300,000 square foot high school in Heber City, Utah. HVAC work includes three (3) 300-ton chillers, six (6) 3,000,000 btu boilers, fourteen (14) custom-built air handling units with associated VAV boxes, controls and hydronic piping. Plumbing work includes domestic water, waste and vent piping, roof drain piping, acid waste piping and compressed air piping. Work also includes installation of all kitchen and restroom equipment.
Hill Air Force Base – North Plating Shop:
Owner Direct
Design/Build Plating Shop remodel. This work includes the replacement of the cadmium and chrome lines. Work also includes installation of three (3) large ovens, forty-nine (49) tanks, steam, gas, reverse osmosis, air and acid waste piping. Integration of new Allen Bradley control system with existing building systems, tanks, overhead crane and new scrubbers with PVC ductwork.
Utah Transit Authority–Warm Springs Facility:
Owner Direct
Performance of miscellaneous upgrade work to retrofit existing warehouse space into full functioning maintenance facility. This work includes design-build vehicle exhaust system, warehouse heating system and office build-out. Work consists of gas piping, steam piping, equipment installation, electrical and various other build-out tasks.
City Creek Tower 5:
Jacobsen
Complete core and shell HVAC and plumbing for 22 level high rise. Install high efficient make up air unit, boilers, exhaust fans, and water source heat pumps. Complete 3D layout of floor penetrations and imbeds for hangers and seismic bracing for future HVAC and plumbing in condos.
Fashion Place Mall:
Camco Construction
Demolition of plumbing of HVAC systems for preparation of added tenant space. Relocation of site utilities to allow for new buildings. Complete plumbing and HVAC systems on new buildings. Remodeled existing facility.
Walker Center Renovation:
Jacobsen
Design-assisted project for the complete renovation of all mechanical and plumbing systems throughout the 17-story building. Mechanical work consisted of one (1) new chiller, four (4) boilers, associated fan-coil units and ductwork and complete new DDC control system. Plumbing work includes new restrooms throughout building.
IMC – Womens & Newborns / Outpatient Care:
Layton Construction
Six floor tenant finish at the new IHC Hospital at 5400 South State. HVAC work includes installation of 137 VAV boxes with associated controls and hydronic piping. Plumbing work includes waste and vent piping, medical gas piping and installation of 200 sinks and 100 toilets.
Sunrise at Escala :
Wadman Corporation
Construction of a new 4-story, 90 unit condominium complex with underground parking. HVAC consists of installation of one (1) cooling tower, one (1) chiller and two (2) boilers supplying 272 fan coil units. Snowmelt system includes two (2) boilers and 25,000 square feet of underground piping. Plumbing includes waste, vent, domestic water and roof drains.
Auto Owners Insurance:
Layton Construction
Complete plan spec HVAC and plumbing project. Snow melt, boilers, chillers, seismic engineering and bracing, DDC control system. Air handler and VAV system.
Silver Baron Lodge – Deer Valley:
Construction of new 5-story building with 25 high-end condo units. Mechanical work includes installation of four-pipe heating and air-conditioning system, boiler installation, parking garage snowmelt system and installation of all plumbing fixtures.
Provo Center for the Arts:
Hogan
Complete demolition of the Provo city library and installation of all mechanical systems for a new theatrical center. Work includes installation of a hot-water VAV system including boiler, piping and associated insulation. Work also includes a complete plumbing system.
Freeport Landmark Buildings 2, 3 & 4:
Layton Construction
Complete plumbing, heating and air conditioning installation for over 1,650,000 square feet of building shell space. Plumbing work includes roof drain installation, water, waste, vent and gas piping. HVAC work includes installation of twenty (20) 1,375,000 btu make-up air units with all associated ductwork and controls.
E-Trade Tenant Finish:
New Concepts
Complete tenant finish of over 80,000 square feet on 4 stories. Contract to completion for this project was 73 days. Mechanical work included installation of sixty-three (63) VAV boxes with associated hot water piping and supply/return ductwork and five (5) Stultz computer-room units with associated chilled water piping. Plumbing work consisted of the installation of four (4) additional restrooms on each floor and miscellaneous break room sinks.
Stag Lodge:
Layton Construction
Complete mechanical remodel of 4-story resort lodge. Work includes demolition of existing units, ductwork and piping. HVAC work includes installation of new air handling units, chiller, fan coil units with associated ductwork and controls. Plumbing work includes new fixtures, snowmelt system, grease and waste piping and kitchen equipment installation.
University of Utah College of Social Work:
Big D
Complete mechanical system for a new 2-story addition on the University of Utah campus for the College of Social Work. Mechanical work includes installation of a new 50-ton custom air-handling unit, with a VAV box distribution system, associated ductwork and controls. Plumbing work includes chilled and hot water piping, waste and vent piping and domestic distribution piping as required.
ATK – Buildings H5 and H6:
Owner Direct
Installation of six (6) make-up air units and one (1) rooftop unit with miscellaneous ductwork and controls.
  • Global Parts: 3G Construction
  • Utah National Guard: Owner Direct
  • BMW: New Concepts
  • Calvin Rampton Building: Utah Tile & Roofing
  • O’ Shucks: Quarry Village
  • O.C. Tanner
  • Fort Douglas
  • Injection Molding
  • Fed Ex
  • Sunroc
  • Tai Pan Trading
  • Granite School Distric- data center
  • Franklin Tempelton: Big D
  • Camp Williams- marine building: Big D
  • Sundial Lodge: Canyons
  • Goldman Sachs: Okland Construction
  • John Paris
  • Coremark: 3G Construction
  • American Fork Hospital
  • Salt Palace- Upgrade
  • BioLife: Trane
  • Huish Detergents
  • Johnson Matthey Refinery
  • Kennecott: Layton Construction
  • Stein Erickson Lodge: Layton Construction
  • Dugway
  • Silverado Restaurant: Newstar Construction
  • Ferguson: Midgley Construction
  • West Jordan Waste Management: Owner Direct
  • Bard Access: Big D
  • Jordan High School: Owner Direct
  • Stag Lodge: Layton Construction
  • Salt Lake Community College
  • Sandy Park Center Building 2: Okland Construction
  • West Liberty Foods: Gleeson
  • LHM Toyota Murray: Big D
  • UVU- Student Life Center: Jacobsen
  • BYU- Laundry & Maintenance Buildings: Zwick
  • Varian Medical:Jacobsen
  • Skyline High School
  • Evergreen Middle School
  • Reckitt Benckiser: Okland Construction
  • Exelis Aerostructures: Big D
  • UUHC/PCMC Ambulatory Care Parking Structure: Jacobsen
  • Provo Fire Station: Layton Construction